10.5 Hectares on Highway 45 Celaya-Salamanca with 775 meters of frontage to the highway and a railway line bordering the back, ideal for an Industrial Plant.
It has a 3" well
From which they can extract 70,000 to 80,000 Cubic Meters per Cycle (every 6 months)10.5 Hectáreas en la Carretera 45 Celaya-Salamanca con 775 mts de Frente a carretera y Vía de Ferrocarril colindante en parte trasera, ideal para Planta Industrial.
Cuenta con Pozo de 3"
Del cual pueden extraer de 70,000 a 80,000 Metros Cúbicos por Ciclo (cada 6 meses)