Warehouse No. 8 Complete 6,500M2
Rental price of warehouse and offices
== 6,500 m2 covered.
The STORAGE AREA is COMPLETELY FREE as it has NO INTERMEDIATE COLUMNS.
+ Storage 6,500 m2
+ Offices 300 m2
+ Minimum Height: 9mts.
+ 3 loading docks
+ 8 lines of acrylic sheets of 40mts on the roof
+ 5 Roll-up Metal Curtains
+ 8 Bathrooms
+ Firm with reinforced concrete floor 18 cm. with
Resistance of 3 Ton/m2
+ 8 Skylights
+ 125 Industrial lamps.
+ 220 three-phase power and 1,500 kva substation shared with independent light meters
+ City water
+ Septic tank.
Access to the Industrial Park
1. Av. Universidad / Carretera Colombia / Monterrey-Saltillo bypass to the west.
2. Av. Barragán / Av. Raúl Salinas Lozano / Monterrey-Saltillo bypass to the east.
3. Av. Miravista / La Amistad Bridge / Av. La Amistad / Pemex Gas Pipeline TwoBodega N°8 Completa 6,500M2
Precio de renta de nave y oficinas
== 6,500 m2 techados.
El ÁREA de Almaccenaje es TOTALMENTE LIBRE ya que NO tiene COLUMNAS INTERMEDIAS.
+ Almacenaje 6,500 m2
+ Oficinas 300 m2
+ Altura Mínima: 9mts.
+ 3 andenes
+ 8 líneas de láminas acrílicas de 40mts en techo
+ 5 Cortinas Metálicas Enrollables
+ 8 Baños
+ Firme con piso de concreto armado 18 cm. con
Resistencia de 3 Ton/m2
+ 8 Linternillas
+ 125 lamparas Industriales.
+ Luz 220 trifásica y Subestación de 1,500 kva compartida con medidores de luz independiente
+ Agua de la ciudad
+ Fosa Séptica.
Accesos al Parque Industrial
1. Av. Universidad / Carretera Colombia / Libramiento Monterrey-
Saltillo al poniente.
2. Av. Barragán / Av. Raúl Salinas Lozano / Libramiento Monterrey-
Saltillo al oriente.
3. Av. Miravista / Puente La Amistad / Av. La Amistad / Gaseoducto Dos
de Pemex