Well located land opportunity by the Monterrey - Saltillo Highway between HOLCIN (APASCO) and TUPY. Industrial or Commercial Land Use. With access to the railway tracks. Completely flat 100% usable. Everything can be negotiated in parts. Irregular polygon with 924 m front by 595 m depth approx. Equipment: East boundary of the lot is the railway track Two high voltage lines Fiber optic line Two gas pipeline lines Water feasibility. Own well and Municipal Supply (Ramos Arizpe) GPS: 25.61 N 100.88 W COMMUNICATION: 700 meters from the Monterrey Saltillo Highway In process Special Access Road of 16 to 20 meters wide and 700 meters long that connects to Highway 40. Total boundary with the peripheral ring (northwest axis, main trunk of the new Saltillo Mty road) 1000 meters from Highway 57 (new junction to Monclova Highway) ADJACENT PROPERTIES: Kimberly Clark de México Plant HOLCIN APASCO Cement Plant TUPY Foundry PlantOportunidad Terreno muy bien ubicado por la Autopista Monterrey - Saltillo entre HOLCIN(APASCO) y TUPY.
Uso de Suelo Industrial o Comercial. Con acceso a pie de Vías de Ferrocarril.
Completamente plano 100% aprovechable. Se puede negociar todo en parte.
Poligono irregular con 924 m de frente por 595 M fondo Aprox.
Equipamiento:
Límite Oriente del Lote es la vía del Ferrocarril
Dos lineas de Alta Tensión
Linea de Fibra Óptica
Dos Lineas de Gasoducto
Factibilidad de Agua. Pozo Propio y Abastecimiento Municipal (Ramos Arizpe)
GPS: 25.61 N 100.88 W
COMUNICACIÓN:
A 700 metros de la Autopista Monterrey Saltillo
En proceso Vía de Acceso especial de 16 a 20 Metros de ancho y 700 Metros de Largo que comunique con la Autopista 40.
Colindancia Total con el anillo peroiférico (eje norponiente, troncal de nueva carretera Saltillo Mty)
A 1000 metros de la Carretera 57 (nuevo entronque a Carretera Monclova)
PREDIOS CONTIGUOS:
Planta Kimberly Clark de México
Planta Cementos HOLCIN APASCO
Planta de Fundición TUPY