Delivery for MARCH 2025
• Construction:
• Warehouse: 19,207 m2
• Offices: 4% of offices.
FIRE SYSTEM HOSES AND CABINETS IN COMPLIANCE WITH NFPA REGULATIONS, THE SYSTEM CAN BE UPDATED FOR THE USE OF SPRINKLERS
CLEAR HEIGHT (M) 12.00
FLOOR: 15 CM CONCRETE WITH A LOAD CAPACITY OF 6 TON/M2
ROOF: KR-18 PINTRO SHEET (SLOPE OF 5.1%) THERMOSHIELD REFLECTIVE INSULATOR WITH DOUBLE BUBBLE METALLIC WHITE COLOR
WALLS: TILT-UP LIGHTING SYSTEM AT THE REQUEST OF THE CLIENT
DIMENSIONS: (MTS) 188.80 X 106.80
SPACE BETWEEN COLUMNS: (MTS) 15.73 X 15.23 M
CONFIGURATION: FRONT DOCK
NATURAL LIGHTING: (%) 6.50%
AIR CHANGES: PER HOUR SYSTEM BASED ON Lou Vers
DOCKS: 24 DOCKS WITH MECHANICAL LEVELING RAMP OF 30,000 LB, ADDITIONALLY HAS 08 KNOCK-OUT POSITIONS.
ACCESS RAMPS: 2 CONCRETE ACCESS RAMPS.
LOADING PARKING -
VEHICULAR PARKING 85 SPACES
ELECTRICAL INSTALLATION 1 (TRANSFORMER) WITH A NOMINAL CAPACITY OF UP TO 700 KVA AT MEDIUM VOLTAGE.
DIVISIBLE 2 MODULES
BENEFICIAL DELIVERY 4Q 2024
FINAL DELIVERY 1Q 2025Entrega para MARZO 2025
• Construcción:
• Bodega: 19,207 m2
• Oficinas: 4% de oficinas.
SISTEMA CONTRA INCENDIO MANGUERAS Y GABINETES EN CUMPLIMIENTO CON NORMATIVA NFPA, EL SISTEMA PUEDE ACTUALIZARSE PARA EL USO DE ROCIADORES
ALTURA LIBRE (M) 12.00
PISO : CONCRETO DE 15 CM Y CAPACIDAD DE CARGA 6 TON/M2
TECHUMBRE: LAMINA KR-18 PINTRO (PENDIENTE
DEL 5.1%) AISLANTE THERMOSHIELD REFLECTIVO DE DOBLE BURBUJA COLOR BLANCO METALICO
MUROS: TILT-UP SISTEMA DE ILUMINACION A PETICION DEL CLIENTE
DIMENSIONES: (MTS) 188.80 X 106.80
ESPACIO ENTRE COLUMNAS :(MTS) 15.73 X 15.23 M
CONFIGURACION: FRONT DOCK
ILUMINACION NATURAL: (%) 6.50%
CAMBIOS DE AIRE : POR HORA SISTEMA A BASE DE Lou Vers
ANDENES: 24 ANDENES CON RAMPA NIVELADORA MECANICA DE 30,000 LB, ADICIONALMENTE CUENTA CON 08 POSICIONES DE KNOCK-OUTS.
RAMPAS DE ACCESO: 2 RAMPAS DE ACCESO DE
CONCRETO .
ESTACIONAMIENTOS DE CARGA -
ESTACIONAMIENTO VEHICULAR 85 LUGARES
INSTALACION ELECTRICA 1 (TRANSFORMADOR) CON
CAPACIDAD NOMINAL DE HASTA 700 KVA EN MEDIA TENSION.
DIVISIBLE 2 MODULOS
ENTREGA BENEFICA 4Q 2024
ENTREGA DEFINITIVA 1Q 2025