Industrial land to build a condominium for industrial use in the municipality of El Salto, Jalisco.
• Authorized permits to build 15 warehouses of 18 x 60
• Potable water and services at the edge of the land
• Possibility of contribution with a trust.
• Land use I2, medium industry and medium risk, with a report on layouts, uses, and destinations.
• 100 meters of wall
• 1,000 meters of tepetate for the platform
• Distance 5 KMS from Guadalajara airport zone
• Behind Grupo Urrea
• Land deeded
Price per m2 $3,000 M2
Surface: 24,490 m2.
It has a land use report for warehouse permit, status provisional suspension.
The clay soil has been removed 1 meter deep to firm ground, it is prepared to place sub-base, the total area of the land.
It has 2 contracted potable water connections of ½ inch.
It has the feasibility of having treated water for industrial purposes.
It has soil mechanics studies and topographic level curve.
It has CFE electricity feasibility.
It has 500 m3 of crushed stone within the property.
A project for the construction of warehouses of 1,000 m2 on average is included, it can start immediately.Terreno Industrial para edificar un Condominio de uso Industrial en municipio de El Salto, Jalisco.
•Permisos autorizados para construir 15 bodegas de 18 x 60
•Agua potable y servicios a pie de terreno
• Posibilidad de aportación con fideicomiso.
• Uso de suelo I2, Industria mediana y de riesgo medio, con dictamen de trazos, usos y destinos.
•100 metros de barda
•1,000 metros de tepetate para la plataforma
• Distancia 5 KMS Zona aeropuerto Guadalajara
•A espaldas de Grupo Urrea
• Terreno escriturado
Precio m2 $3,000 M2
Superficie: 24,490 mts 2.
Cuenta con Dictamen de uso de suelo para Permiso para bodegas, estatus suspensión provisional
El suelo de arcilla ya se retiró 1 mt. de profundidad hasta piso firme, está preparado para colocar subase, el total del área del terreno.
Tiene 2 tomas de agua potable contratada de ½ pulgada
Tiene factibilidad de contar con agua tratada para fines industriales
Si tiene estudios de mecánica de suelo y curva de nivel topográfica
Tiene factibilidad de luz CFE
Tiene acarreadas 500 mts 3 de piedra brasa dentro del predio.
Se incluye proyecto para la edificación de bodegas de 1,000 mts promedio, ya se puede arrancar de inmediato.