New community made up of 259 residential lots, which responsibly merge nature with urban development, concentrating services, amenities and amenities of a city, with the benefit of being in nature.
Land of 40 hectares:
14 hectares of navigable lake with a depth of 5 to 7 meters
4 Types of lots:
Ground Level-117 single-family residential lots
Lake Front-83 single family residential lots
Peninsula lots-50 single-family residential lots
Macrolotes-9 condo hotel lots
It has a beach club in Tulum
The 10,000 meters of amenities will be divided as follows:
PHASE 1- Court, pool, gym, and shopping area
PHASE 2- Club house 3200 m2 and event room
PHASE 4- Kids club, gym, courts, semi-Olympic pool, shopping area
PHASE 6- Wellness center, island spa and event room, 4 km linear park surrounding the lake
Services:
Water with a layer connection
• Drainage Network
• Underground light
• Treatment plant
• Voice and Data (optical fiber)
DELIVERY STAGES:
From summer 2023 to winter 2026
January 2022: Construction (infrastructure and operation)
March/April 2022: development entryNueva comunidad conformada por 259 lotes residenciales, que fusionan de manera responsable a la naturaleza con el desarrollo urbano, concentrando servicios, amenidades y comodidades de una ciudad, con el beneficio de estar en la naturaleza.
Terreno de 40 hectareas:
14 hectareas de lago navegable con profundidad de 5 a 7 metros
4 Tipos de lotes:
Ground Level-117 lotes residenciales unifamiliares
Lake Front-83 lotes residenciales unifamiliares
Lotes Península-50 lotes residenciales unifamiliares
Macrolotes-9 lotes condo hoteleros
Cuenta con club de playa en Tulum
Los 10,000 metros de amenidades se dividirán de la siguiente manera:
FASE 1- Cancha, alberca, gym, y zona comercial
FASE 2- Casa club 3200 m2 y salón de eventos
FASE 4- Kids club, gimnasio, canchas, alberca semi olímpica, zona comercial
FASE 6- Wellness center, spa island y salon de eventos, parque lineal de 4 km rodeando el lago
Servicios:
Agua con conexión con capa
• Red de Drenaje
• Luz subterránea
• Planta de tratamiento
• Voz y Datos (fibra óptica)
ETAPAS DE ENTREGA:
Desde verano 2023 hasta invierno 2026
Enero 2022 : Obra (infraestructura y explotación)
Marzo / Abril 2022: entrada del desarrollo